John
A. Alario, Sr. Events Center at Bayou Segnette |
 |
 |
 |
 |
$12,000,000
Marrero, LA
|
Complete
MEP design. 72,000 SF multi-use facility, designed in
1999, including gymnasium and meeting rooms. The mechanical
design includes A/C system for the volleyball and basketball
courts utilizing heat recovery system for maximum energy
conservation efficiency for the large amount of outside
air required to maintain indoor air quality. The electrical
design includes a state of the art sound system and life
safety voice evacuation system. |
|
 |
 |
|
 |
 |
East
Jefferson Wellness Center |
 |
 |
 |
$6,500,000
Metairie, LA
|
Complete
MEP design. A 38,000 SF fitness center, designed in 1999,
includes three indoor swimming pools, running track and
exercise rooms. The mechanical design includes chilled
water and heat recovery to maintain pool water temperature.
The electrical design includes a state of the art life
safety voice evacuation system. |
 |
|
 |
 |
|
 |
 |
Hollywood
Casino |
 |
 |
 |
|


|
$80,000,000
Shreveport, LA
|
Complete
MEP design. The mechanical and electrical design of this
project included a 400-room high-rise hotel tower with
meeting space, theater and restaurants, a high-rise parking
garage, retail strip malls, surface parking lot and dockside
facilities for the gaming boat. A terminal bridge was
designed to cross Clyde Fant Parkway for direct access
between the parking garage and hotel promenade. The garage
design included a dedicated ventilation system to control
carbon monoxide levels in the basement and an emergency
generator. The dockside facilities included a dedicated
secondary chilled water piping system, domestic water,
firewater, sewer, oil removal, 460 volt power distribution,
data, telephone and an integrated fire alarm system connecting
all facilities. |
|
 |
 |
|
|
|
|