 |
$47,000,
000
New Orleans, LA
|
Complete
MEP design. New 1.1 million square foot warehouse. The
mechanical design includes heating and ventilating the
warehouse that required non-condensing conditions. Temperature/humidity
sensors were utilized to maintain the interior temperature
10o above outside dewpoint. The ventilation/heating were
controlled by automated control systems. The electrical
design includes a primary voltage metering from Entergy
with 4.5kV secondary distribution. |